Building Quantity & Cost Estimator

Hi everyone following tool will help you to gain the building quantity and cost estimation. Kindly provide an input in yellow cells and watch the following video for reference.



Building Estimation By Parag Pal.
Total Area Sq.Ft
Total Cost
Labour Cost
Material cost
Contractor Profit
Provide input in yellow box
Item Quantity Unit Rate Total Amount
Bazri CUM
Binding Wire Kg
Bitumen Kg
Brick Blast CUM
Brick Tiles NOS
Bricks NOS
Cement Bags
Cement for Base Coarse Bags
Cement Paint SqM
CI Pipe Meter
Coarse Sand CUM
Commercial Hardwood RFT
Earth CUM
Fine Sand CUM
Glaze Tile SqM
Hard Wood Shutter NOS
Hardwood and Commercial Plyboard NOS
Hardwood Window Shutter NOS
Iron Grills Kg
MS Steel Kg
Oil Bound Distemper with Labour SqM
Paint Work with Labour SqM
Sand CUM
Shuttering SFT
Stone Blast CUM
White Cement Bags
Sub Total:
Rate Analysis
Foundation
Cement Concrete 1:6:12
Cement Bags
Stone Blast CUM
Sand CUM
Labour for Cement Concrete
Total for Cement Concrete 1:6:12
Brick Work in Foundation with Cement Mortar 1:6
Labour for Brick Work Foundation
Sand CUM
Cement Bags
Bricks NOS
Total for Brick Work in Foundation with Cement Mortar 1:6
Horizontal DPC with Cement Concrete 1:2:4( 40MM)
Labour for DPC
Bitumen Kg
Cement Bags
Coarse Sand CUM
Bazri CUM
Total for Horizontal DPC with Cement Concrete 1:2:4( 40MM)
Earth Work in Excavation in Foundation and Filling under Floors
Labour for Earth Excavation & Earth Filling
Total for Earth Work in Excavation in Foundation and Filling under Floors
Super Structure
RCC without Steel Cement Concrete 1:1.5:3
Labour for RCC
Shuttering SFT
Bazri CUM
Coarse Sand CUM
Cement Bags
Total for RCC without Steel Cement Concrete 1:1.5:3
MS Steel For RCC
Labour for Steel RCC
MS Steel Kg
Binding Wire Kg
Total for MS Steel For RCC
Brick Work in Super Structure Cement Mortar 1:6
Labour for Brick Sup. Str
Cement Bags
Sand CUM
Bricks NOS
Total for Brick Work in Super Structure Cement Mortar 1:6
Brick Tile Tracing on Roof
Earth CUM
Sand CUM
Cement Bags
Labour for Brick Tiles
Brick Tiles NOS
Bitumen Kg
Total for Brick Tile Tracing on Roof
Rain Water Pipe
CI Pipe Meter
Labour for pipe including cost of Joints
Total for Rain Water Pipe
Flooring
Ceramic Glaze Tiles Flooring 300X300 MM First Quality with course
Glaze Tile SqM
Cement Bags
White Cement Bags
Cement for Base Coarse Bags
Fine Sand CUM
Brick Blast CUM
Coarse Sand CUM
Labour for Ceramic Glaze Tile
Total for Ceramic Glaze Tiles Flooring 300X300 MM First Quality with course
Plastering/Wall tiles
Plaster on Ceiling (Roof) Cement Mortar 1:4
Sand CUM
Cement Bags
Labour for Ceiling Plaster
Total for Plaster on Ceiling (Roof) Cement Mortar 1:4
Plaster on Walls Cement Mortar 1:4
Labour for Wall Plaster
Cement Bags
Sand CUM
Total for Plaster on Walls Cement Mortar 1:4
Cement Pointing Cement Mortar 1:2
Sand CUM
Labour for Pointing
Cement Bags
Total for Cement Pointing Cement Mortar 1:2
Glazed Tiles in Dado or Skirting in Bathroom snd Kitchen Walls
Glaze Tile SqM
Total for Glazed Tiles in Dado or Skirting in Bathroom snd Kitchen Walls
Door,Window,Cupboard shutter,Iron Grills
Hardwood Door
Hard Wood Shutter NOS
Total for Hardwood Door
Hardwood Frame Including Labour
Commercial Hardwood RFT
Total for Hardwood Frame Including Labour
Hardwood Window
Hardwood Window Shutter NOS
Total for Hardwood Window
Hard Wood Frame and Commercial Plyboard Shutter
Hardwood and Commercial Plyboard NOS
Total for Hard Wood Frame and Commercial Plyboard Shutter
Iron Grilling with Labour
Iron Grills Kg
Total for Iron Grilling with Labour
Paint
Paint on Wooden Doors and Windows
Paint Work with Labour SqM
Total for Paint on Wooden Doors and Windows
Oil Bound Distemper with Filling on Walls
Oil Bound Distemper with Labour SqM
Total for Oil Bound Distemper with Filling on Walls
Exterior Finish Cement Paint Snowcem
Cement Paint
SqM
Total for Exterior Finish Cement Paint Snowcem
Sub Total:
Add 10% for Electric fitting wiring & Labor:
Add 10% for Water Supply fitting & Sanitary:
Add 5% for Sewerage:
Grand Total:


Building Quantity & Cost Estimator Building Quantity & Cost Estimator Reviewed by Parag Pal on 6:38 AM Rating: 5